Skeleton Cable Reels with Trolley and Reeling Stand
Contact Supplier
Product Highlights
- Durable Steel Construction: Constructed from heavy-duty welded steel tubing with passivated zinc plating.
- Customized Design Available: Product is fully customized to meet specific client requirements.
- Fire and Flame Retardant: Features fire and flame retardant properties for enhanced safety.
- Dual Flange Configurations: Offers two-flange for standard cables and three-flange for SMPTE 311M fiber.
- Integrated Trolley and Stand: Optional heavy-duty trolley with reeling stand and pneumatic tires.
- ISO and CE Certified: Products meet CE and ISO9001:2000 quality system certifications.
- Optimized for Fiber Cables: Three-flange design protects inner fiber ends without tight coiling.
- Established Manufacturer: Specialized in spools and reels since 1991 with advanced manufacturing.
Product Attributes
- Customization
- Available
- Type
- Steel Bobbin
- Certification
- CE, ISO
- Model NO.
- TY-600E
- Customized
- Customized
- Condition
- New
- Feature
- Fire/Flame Retardant
- Transport Package
- Industry Packing
- Trademark
- ONEREEL
- Origin
- Ningbo China
- Production Capacity
- 1000piece/Month
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Skeleton Cable Reels with Trolley and Reeling Stand
Find Similar Products
Product Description
SKELETON CABLE REELS WITH TROLLEY AND REELING STAND
This range of extremely rugged 'skeleton' cable drums is particularly suited to life on the road but also at home in a TV or film studio. They are constructed from heavy-duty, welded, steel tubing, on to which an overall passivated zinc plate is applied. A traditional two-flange type is suitable for triax camera cable, multicore audio cable and heavy-duty power cables. An innovative three-flange design is suitable for coiling and protecting the inner 'tail' of SMPTE 311M hybrid fibre camera cable. An optional combined trolley and reeling stand is available for transporting the drums.
Cable Reels
Two-Flange Reels - Triax, multicore audio and heavy-duty power cables
This is a traditional skeletal design, with space within the hub for a short length from the inner end of the cable,
which may be pulled out and connected to the tailgate or wall box without the need to unreel the cable completely.
Three-Flange Reels - SMPTE 311M HDTV fibre hybrid cables
These are a development of the traditional style drum designed, in conjunction with BBC Outside Broadcasts, specifically to accommodate SMPTE 311M fibre hybrid camera cables.
Longer lengths of fibre are generally preferred, as this avoids the need to join shorter assemblies and reduces the number of drums which must be taken to site. However, where the whole length is not required at a location, it is inconvenient to unreel the whole length to gain access to the inner (CCU) end. With copper cables it is usually possible to store the short length of the cable inner end, that is typically required to connect to a tailgate or wall box, within the hub of the drum, giving access even when the cable is not completely unreeled. The minimum bend radius of fibre hybrid cables must be strictly adhered to, if damage to the fibre is to be avoided, so it is impossible to coil the couple of metres from the inner end of the fibre, tightly, within the main hub.
The additional flange and large-diameter hub allows up to five metres of fibre from the inner end to be safely coiled and protected while the main cable is run out. The inner end can then be unwound and connected to the tailgate or wall box.
Dimensions and weight:
| Type | 200 | 400 | 200 | 300 | 500 |
|---|---|---|---|---|---|
| ONEREEL code | 39-043 | 39-044 | 39-046 | 39-047 | 39-048 |
| Standard | Standard | Triple Flange | Triple Flange | Triple Flange | |
| Flange diameter: | 615mm | 615mm | 615mm | 615mm | 615mm |
| Hub diameter: | 230mm | 230mm | 230mm | 230mm | 230mm |
| Drum width: | 180mm | 270mm | 240mm | 295mm | 330mm |
| Weight (1): | 7.0kg | 7.5kg | 8.5kg | 8.84kg | 9.05kg |
| Capacities (1): | |||||
| Triax, 11-11.5mm: | 200m | 400m | n/a | n/a | n/a |
| Triax, 14mm: | 100m | 200m | n/a | n/a | n/a |
| Multi quad, 16.7mm: | 100m | 200m | n/a | n/a | n/a |
| Power,16A, 13mm: | 100m | 200m | n/a | n/a | n/a |
| Power, 32A, 17mm: | 100m | 200m | n/a | n/a | n/a |
| Power, 64A, 30mm: | 25m | 50m | n/a | n/a | n/a |
| SMPTE311M, 9.2mm: | n/a | n/a | 200m | 300m | 500m |
Note (1): Weights and capacities are approximate.
Optional accessories: The riveted series of Canford hook and loop cable ties may be permanently attached to the drum flange or cable so they are always readily available to secure the loose ends of the cable when coiled. See Index: Cable ties.
Heavy Duty Trolley and Reeling Stand
As the combined weight of a drum and cable may exceed 70Kg, a heavy-duty trolley is available. This incorporates a reeling and unreeling stand with combined shaft and crank-handle. Unlike some economy versions, this trolley is constructed from the same formed, heavy-duty steel tubing, over-plated with passivated zinc, as is used for the drums. It has pneumatic tyres, giving a smooth ride over uneven or pot-holed surfaces, door guide-troughs, ramps and small steps. Once at the reeling location, drums may be located on the combined shaft and crank-handle, within the trolley frame, for unreeling. Two 200m drums may be fitted side-by-side, allowing both cables to be run out simultaneously. Physically, the trolley will accommodate up to five stacked drums for transport, however, when the drums are loaded with cable, this may be excessively heavy. Due consideration must be given to the health and safety of the user and the capability of ramps and similar walkways to support the combined weight of trolley, drums, cables and operator.
ONEREEL is specialized in the manufacture of reels for cables and electric wires, iron axles, disc spool for steel cables and various delivery reels. With strong technological capabilities and full series of production equipment. All of our products go through the dynamic and static balance tests. We have passed the quality system certification ISO9001:2000 to ensure the product quality. Following the standards of GB4004-83, JB/T8997, DIN46395 and DIN46397 in productions.
Packaging & Transportation
Authoritative Certificate
A: According to spool model and material, we will advise.
Q2: How long is the sample LEAD TIME?
A: For existing samples, it takes 2-3 days. If no stock, we will advise lead time.
Q3: Can you develop new products?
A: Yes, we have new products developing ability and we are good at developing new mold.
Q4: How much is the freight charge?
A: It depends on spool package volume, if small quantity, volume and urgent goods,
we may advise FEDEX or other couriers' charge for your check.
If volume bigger and by seaway suitable, we provide FOB or CIF price to you.
Q5: What format of the file do you need if I want my own design?
A: We have our own mound workshop and can provide spool or other plastic product developing and injection service.
Q6: How about your service?
A: We have pre-sale service, in-sale service and after-sale service. As "Customer First" is the most important principle of company operation.
You can freely help you out either Tech issue or Products requirements. Pls approach us. Thanks.
About the Supplier
Company Profile
NINGBO ONEREEL MACHINE Co., Ltd. is one of the leading metal parts and plastic parts manufacturers and exporters in China, such as empty spool, wire spool, steel cord spool, warp knitting beam, pumps and cable construction, OEM customer parts. ONEREEL located in Ningbo City, near Ningbo Seaport and Ningbo Airport.
We have passed the quality system certification ISO9001: 2000 to ensure the product quality. Following the standards of GB4004-83, JB/T8997, DIN46395 and DIN46397 in productions. We can design and tailor various non-standard items subject to the specific requirements of the customers. Focusing on top quality, superior innovation, reasonable price and strong competitiveness, our products have been appreciated and recognized by majority of customers. So far we have built long-term cooperation with more than 60 well-known enterprises from domestic and oversea market. The company hold on philosophy of "Create value, Quality first, Credit first". Effective and Strict internal management, precisely control quality and delivery time, pursuing integrity services, we always put customer satisfaction as the highest goal. ONEREEL sincerely hope tightening cooperation with domestic and oversea customers and create bright future hand in hand!
About Our Factory & Business Background
- Address
- 16th Floor, Block B, No.1229 Baoshan Road,Beilun,Ningbo 315800 China
- Terms of Payment
- LC, T/T, PayPal, Western Union
- International Commercial Terms(Incoterms)
- FOB, EXW, CFR, CIF
- Average Lead Time
-
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays - Nearest Port
- Ningbo
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2005-02-07
- Main Markets
- North America, Eastern Europe, Africa, Mid East, Eastern Asia, Western Europe
FAQ
- Can I get samples?
- According to spool model and material, we will advise.
- How long is the sample LEAD TIME?
- For existing samples, it takes 2-3 days. If no stock, we will advise lead time.
- Can you develop new products?
- Yes, we have new products developing ability and we are good at developing new mold.
- How much is the freight charge?
- It depends on spool package volume, if small quantity, volume and urgent goods, we may advise FEDEX or other couriers' charge for your check. If volume bigger and by seaway suitable, we provide FOB or CIF price to you.
- What format of the file do you need if I want my own design?
- We have our own mound workshop and can provide spool or other plastic product developing and injection service.
- How about your service?
- We have pre-sale service, in-sale service and after-sale service. As 'Customer First' is the most important principle of company operation. You can freely help you out either Tech issue or Products requirements. Pls approach us. Thanks.
Send your message to this supplier
People who viewed this also viewed
-
US$0.10-100.00 / Piece
-
US$5.00-50.00 / Piece
-
US$1,500.00-4,500.00 / Piece
-
US$20.00-600.00 / Piece
-
US$2.00-20.00 / Piece
-
US$0.20-10.00 / Piece
-
US$0.20-20.00 / Piece
-
US$20.00-500.00 / Piece
-
US$0.50-50.00 / Piece
-
US$5.00-15.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- steel spool
- Others steel spool
- Skeleton Cable Reels with Trolley and Reeling Stand
Related Categories
Hot Searches
- China Cable Factories
- Electric Cable Factories
- Wire Cable Factories
- Electrical Wire And Cable
- Wooden Cable Reel
- Used Cable Reel
- Electrical Cable Reel
- Plastic Cable Reel
- Reel Cable Box
- Top 10 Cable
- Cable Trends
- Steel Reel Bulkbuy